• Via Feltre, 183 - Sedico (BL)
  • (+39) 0437 852727
Linkedin
LogoLogo_enco_sticky

Enco Engineering Consultants srl

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Intake Layout
Intake Site
Powerhouse Plan

Project Layout
Penstock Profile
Ruvuma River

Nakatuta Hydropower Project

Project Description:

Run-of-river HPP with a 60m long diversion dam and a 1,480 m long headrace canal.

Gross Head: 40m
Maximum Flow Rate: 30.24 to 45 m3/sec
Turbine type: 3 to 4 Francis turbines
Installed capacity: 9,99 MW to 14.4 MW
Energy output: 85 to 125 GWh

Activities Performed:
Revision of a previous feasibility study
Assessment and substantial modifications of the design.
Preliminary business plan.
Full feasibility study
Full Business plan
Detailed topographic survey
Basic design
Assistance in tender documents

Client:
Tangulf Express Ltd.
Year:
2015 - 2017
Location:
Ruvuma Region, Tanzania

PREVIOUS PROJECT

Yovi Hydropower Plant

NEXT PROJECT

Iria Maina Hydropower Plant

RELATED PROJECTS

Project Layout

Pez Water Supply System Renovation

by webmaster
Map

Mali Hydropower Market Intelligence

by webmaster
Enco-Lingatunda Hydropower Plant3

Lingatunda Hydropower Plant

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2021 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket