• Via Feltre, 183 - Sedico (BL)
  • (+39) 0437 852727
Linkedin
ENCO ITALYcropped-LOGO-BANDIERA-DIMENSIONI-HEADER.png

Enco Engineering Consultants srl

Italian Engineers

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Menu
  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Intake Layout
Intake Site
Powerhouse Plan
Project Layout
Penstock Profile
Ruvuma River

Nakatuta Hydropower Project

Project Description:

Run-of-river HPP with a 60m long diversion dam and a 1,480 m long headrace canal.

Gross Head: 40m
Maximum Flow Rate: 30.24 to 45 m3/sec
Turbine type: 3 to 4 Francis turbines
Installed capacity: 9,99 MW to 14.4 MW
Energy output: 85 to 125 GWh

Activities Performed:
Revision of a previous feasibility study
Assessment and substantial modifications of the design.
Preliminary business plan.
Full feasibility study
Full Business plan
Detailed topographic survey
Basic design
Assistance in tender documents

Client:
Tangulf Express Ltd.
Year:
2015 - 2017
Location:
Ruvuma Region, Tanzania

PREVIOUS PROJECT

Yovi Hydropower Plant

NEXT PROJECT

Iria Maina Hydropower Plant

RELATED PROJECTS

Immagine63

Col Cavalier Tunnel

by webmaster
Enco-Gisenyi Hydropower Plant Rehabilitation2

Gisenyi Hydropower Plant Rehabilitation

by webmaster
Enco-Nogarola Hydropower Plant (3)

Nogarola Hydropower Plant

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2023 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket