Iria Maina Hydropower Plant

Project Description:

Run-of-river SHPP on the river Itare that uses the existing diversion dam of Somorio Small Hydropower Plant.
Low-Pressure Pipe : 257 m long and 2200 mm diameter
Open Flow Canal: 450 m long
Penstocks: 3, made of steel, 77m long.
Pesntocks' Diameters:
1400-1300-1200 mm
allowing nesting in the pipe transportation
Gross Head: 34.6 m
Turbine: 3 Francis groups
Design flow rate: 8.5 m3/s
Installed capacity: 2.4 MW
Energy output: 6 GWh
Transmission Line: 33 kV double circuit
35 mm2 conductor; length: 2 km
Total Project Cost: 9,300,000 $

Activities Performed:
Pre-feasibility Study including:
Site Identification and Assessment
Topographical Survey
Feasibility study including:
Final Design
Power Evacuation Study
Business Plan

Client:
USAID Kenya
Year:
2016 - 2017
Location:
Bomet County, Kenya

PREVIOUS PROJECT

Nakatuta Hydropower Project

NEXT PROJECT

Maresi Hydropower Plant

RELATED PROJECTS

plan

Upgrading of the Pre-Existing Aqueduct of Paderno del Grappa

by webmaster
Nakatuta PowerHouse Layout

Nakatuta Hydropower Project

by webmaster
Enco-Rio Castello Hydropower Plant (2)

Rio Castello Hydropower Plant

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2021 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket