Restoration Works
Penstock
Restoration Works

Gashashi Hydropower Plant Rehabilitation

Project Description:

Existing run-of-river SHPP with weir and frontal intake and a steel penstock; powerhouse with Turgo turbine, tailrace channel.

The necessary works to upgrade the SHPP to 282 kW include: side intake and sluice gate, 8.5 m long headrace closed canal, 17 m long de-silt tank, installation of a Pelton turbine and needed electromechanical equipment, installation of hydromechanical equipment, realization of an access road to the powerhouse.

SHPP final data after rehabilitation: Penstock: 420 m steel
Penstocks’ diameters:
350-325-285mm
Gross head: 115 m
Turbine: 1 Pelton
Design flow rate: 0.35 m3/s
Installed capacity: 282 kW
Energy output: 1.47 GWh

Activities Performed:
The contract includes also Gashashi SHPP and Mukungwa II SHPP Rehabilitation.
- Feasibility study
- Business plan
- Final design
- Tender documents.
- Works supervision as Owner’s Engineer:

Client:
Prime Energy - Rwanda
Year:
2016 - 2018
Location:
Rubavu District, Rwanda

PREVIOUS PROJECT

Maresi Hydropower Plant

NEXT PROJECT

Gisenyi Hydropower Plant Rehabilitation

RELATED PROJECTS

Map

Mali Hydropower Market Intelligence

by webmaster
Immagine39

Ovindoli Rockfall

by webmaster
Intake

Rite 1st Head Hydropower Plant

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2023 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket