• Via Feltre, 183 - Sedico (BL)
  • (+39) 0437 852727
Linkedin
cropped-LOGO-BANDIERA-DIMENSIONI-HEADER.pngLogo_enco_sticky

Enco Engineering Consultants srl

Italian Engineers

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Restoration Works
Penstock
Restoration Works

Gashashi Hydropower Plant Rehabilitation

Project Description:

Existing run-of-river SHPP with weir and frontal intake and a steel penstock; powerhouse with Turgo turbine, tailrace channel.

The necessary works to upgrade the SHPP to 282 kW include: side intake and sluice gate, 8.5 m long headrace closed canal, 17 m long de-silt tank, installation of a Pelton turbine and needed electromechanical equipment, installation of hydromechanical equipment, realization of an access road to the powerhouse.

SHPP final data after rehabilitation: Penstock: 420 m steel
Penstocks’ diameters:
350-325-285mm
Gross head: 115 m
Turbine: 1 Pelton
Design flow rate: 0.35 m3/s
Installed capacity: 282 kW
Energy output: 1.47 GWh

Activities Performed:
The contract includes also Gashashi SHPP and Mukungwa II SHPP Rehabilitation.
- Feasibility study
- Business plan
- Final design
- Tender documents.
- Works supervision as Owner’s Engineer:

Client:
Prime Energy - Rwanda
Year:
2016 - 2018
Location:
Rubavu District, Rwanda

PREVIOUS PROJECT

Maresi Hydropower Plant

NEXT PROJECT

Gisenyi Hydropower Plant Rehabilitation

RELATED PROJECTS

Immagine63

Col Cavalier Tunnel

by webmaster
Immagine39

Ovindoli Rockfall

by webmaster
Aussa works 2

Provincial Road n. 80 “Dell’Aussa – Corno” Restoration Works

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2023 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket