• Via Feltre, 183 - Sedico (BL)
  • (+39) 0437 852727
Linkedin
ENCO ITALYcropped-LOGO-BANDIERA-DIMENSIONI-HEADER.png

Enco Engineering Consultants srl

Italian Engineers

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Menu
  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Intake
Intake
Layout
Intake Layout
Francis Turbine
Powerhouse Section

Nogarola Hydropower Plant

Project Description:

Run-of-river Small Hydropower Plant on the important river Cordevole, located in mountain environment

Details of the Hydropower Plant:
Net Head: 16,9 m
Maximum Flow Rate: 750 l/sec
Penstock Diameter: 800 mm
Penstock Length: 290 m
Turbine Type: Francis
Installed Capacity: 99 kW
Energy Output: 587.000 kWh

Activities Performed:
Feasibility Study
Preliminary and Detailed design
Structural Design
Environmental Imapct Study
Landscape Impact Study
Tender Documents for Civil Works
Tender Documents for Eectromechanical Equipment
Assistance in Tender Award
Assistance in Procurement
Supervision of works

Client:
Hydroalpi S.r.l.
Year:
2010 - 2013
Location:
Santo Stefano di Cadore (BL), Italy

PREVIOUS PROJECT

Sorarù Hydropower Plant

NEXT PROJECT

Rio Castello Hydropower Plant

RELATED PROJECTS

Enco-Lingatunda Hydropower Plant3

Lingatunda Hydropower Plant

by webmaster
Zunaia weir

Torrent Zunaia Flood Management Works

by webmaster
Immagine56

Rockfall at Bismantova Cliff

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2025 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket