Bridge and Dam
Bridge
Francis Turbine
River
Penstocks
Powerhouse from intake

Mukungwa II Hydropower Plant Rehabilitation

Project Description:

Existing run-of-river SHPP with weir and frontal intake, steel penstocks; powerhouse with two Francis turbines; tailrace channel.

The necessary works to upgrade the SHPP from 2.5 MW to 3.6 MW include: a forebay behind the intake, a vertical gate, two trash racks, two bigger turbines.

SHPP final data after rehabilitation:
Penstocks:two 310 m steel
Penstocks’ diameters:
1650-1600-1550 mm
Gross head: 31.55 m
Turbine: 2 Francis groups
Design flow rate: 13.6 m3/s
Installed capacity: 3.6 MW
Energy output: 22.88 GWh

Activities Performed:
The contract includes also Gashashi SHPP and Mukungwa II SHPP Rehabilitation.
- Feasibility study
- Business plan
- Final design
- Tender documents.
- Works supervision as Owner’s Engineer:

Client:
Prime Energy - Rwanda
Year:
2016 - 2018
Location:
Rubavu District, Rwanda

PREVIOUS PROJECT

Gisenyi Hydropower Plant Rehabilitation

NEXT PROJECT

Lingatunda Hydropower Plant

RELATED PROJECTS

prova

Consultancy services for in-pipe hydro systems on water supply pipes

by webmaster
plan

Upgrading of the Aqueduct of Paderno del Grappa

by webmaster
Nintulo Pano-cut

Nintulo Small Hydropower Plant and Solar Based Mini Grid

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2023 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket