Sorarù Head Hydropower Plant

Project Description:
Run-of-river Small Hydropower Plant in mountain environment.

Details of the Hydropower Plant:
Net head: 94,54 m
Penstock Diameter : 800 mm
Penstock Length: 1091 m
Turbine type: 2 Pelton turbines
4 injectors
Installed Capacity: 880 KW
Energy Output: 3.015.000 kWh

Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study
Client:
Municpality of Rocca Pietore (BL), Italy
Year:
2010 - 2011
Location:
Italy, Rocca Pietore (BL)

PREVIOUS PROJECT

Rite 1st Head Hydropower Plant

NEXT PROJECT

Nogarola Hydropower Plant

RELATED PROJECTS

Enco-Gisenyi Hydropower Plant Rehabilitation2

Gisenyi Hydropower Plant Rehabilitation

by webmaster
Immagine32

Slope stabilization nearby private house in Belluno

by webmaster
20190509_103420

Frison Hydropower Plant

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2023 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket