• Via Feltre, 183 - Sedico (BL)
  • (+39) 0437 852727
Linkedin
LogoLogo_enco_sticky

Enco Engineering Consultants srl

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Penstock Layout
Powerhouse
Powerhouse Layout

Intake Section
Pelton Turbines
Works Area

Sorarù Head Hydropower Plant

Project Description:
Run-of-river Small Hydropower Plant in mountain environment.

Details of the Hydropower Plant:
Net head: 94,54 m
Penstock Diameter : 800 mm
Penstock Length: 1091 m
Turbine type: 2 Pelton turbines
4 injectors
Installed Capacity: 880 KW
Energy Output: 3.015.000 kWh

Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study
Client:
Municpality of Rocca Pietore (BL), Italy
Year:
2010 - 2011
Location:
Italy, Rocca Pietore (BL)

PREVIOUS PROJECT

Rite 1st Head Hydropower Plant

NEXT PROJECT

Nogarola Hydropower Plant

RELATED PROJECTS

Immagine32

Slope stabilization nearby private house in Belluno

by webmaster
Immagine9

Palinuro Arch

by webmaster
Rilievo

Schievenin Water Supply System

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2021 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket