Tindniyo Layout Cut

Tindinyo Falls HPP

After successful completion of the Tender Design Documents, ENCO has been selected as Owner’s Engineer by Tindinyo Falls Ltd in February 2020

The small hydropower plant on Yala river, Nandi County, is a 2.4 MW run‐of river project which will be grid connected.

ENCO is actually engaged in the first phase of the assignment including the assessment of the geotechnical study and the review of the EPC Contractor’s design.

Nairobi, February 2020