Project Layout
Weir and Intake Layout
Powerhouse – Section

Bridge – Section
Intake – Plan
Weir Plan and Section

Lingatunda Hydropower Plant

Project Description:

The feasibility study evaluated different combinations of options concerning the powerhouse positioning, access roads and the waterway layout.

The final option is the following:
Gross Head: 189.05 m
Penstock diameter: 1200 mm
Turbines: 2 Pelton
Installed Capacity: 4.5 kW

Activities Performed:
Feasibility study
Topgraphic Drone Survey
Detailed hydrological analysis
Tender design
Assistance in tender documents.

Client:
Lilondi Hydro Ltd
Year:
2018
Location:
West of Madaba
Ruvuma Region, Tanzania

PREVIOUS PROJECT

Mukungwa II Hydropower Plant Rehabilitation

NEXT PROJECT

Mali Hydropower Market Intelligence

RELATED PROJECTS

Plan of the Plant

Aïn-Temouchent Wastewater Treatment Plant

by webmaster
DCIM106GOPRO

Rite 2nd Head Hydropower Plant

by webmaster
Rilievo

Schievenin Water Supply System

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2021 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket