Project Layout
Weir and Intake Layout
Powerhouse – Section
Bridge – Section
Intake – Plan
Weir Plan and Section

Lingatunda Hydropower Plant

Project Description:

The feasibility study evaluated different combinations of options concerning the powerhouse positioning, access roads and the waterway layout.

The final option is the following:
Gross Head: 189.05 m
Penstock diameter: 1200 mm
Turbines: 2 Pelton
Installed Capacity: 4.5 kW

Activities Performed:
Feasibility study
Topgraphic Drone Survey
Detailed hydrological analysis
Tender design
Assistance in tender documents.

Client:
Lilondi Hydro Ltd
Year:
2018
Location:
West of Madaba
Ruvuma Region, Tanzania

PREVIOUS PROJECT

Mukungwa II Hydropower Plant Rehabilitation

NEXT PROJECT

Mali Hydropower Market Intelligence

RELATED PROJECTS

Immagine13

Cala dell’acqua Rockfall

by webmaster
Immagine47

San Leo Rockfall

by webmaster
Enco-Rio Castello Hydropower Plant (2)

Rio Castello Hydropower Plant

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2023 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket