Project Layout
Weir and Intake Layout
Powerhouse – Section

Bridge – Section
Intake – Plan
Weir Plan and Section

Lingatunda Hydropower Plant

Project Description:

The feasibility study evaluated different combinations of options concerning the powerhouse positioning, access roads and the waterway layout.

The final option is the following:
Gross Head: 189.05 m
Penstock diameter: 1200 mm
Turbines: 2 Pelton
Installed Capacity: 4.5 kW

Activities Performed:
Feasibility study
Topgraphic Drone Survey
Detailed hydrological analysis
Tender design
Assistance in tender documents.

Client:
Lilondi Hydro Ltd
Year:
2018
Location:
West of Madaba
Ruvuma Region, Tanzania

PREVIOUS PROJECT

Mukungwa II Hydropower Plant Rehabilitation

NEXT PROJECT

Mali Hydropower Market Intelligence

RELATED PROJECTS

Immagine32

Slope stabilization nearby private house in Belluno

by webmaster
Pettorina Intake

Pettorina – Sorarù Hydropower Plant

by webmaster
E0810-IRIA MAINA_PRESA1

Iria Maina Hydropower Plant

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2021 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket