• Via Feltre, 183 - Sedico (BL)
  • (+39) 0437 852727
Linkedin
ENCO ITALYcropped-LOGO-BANDIERA-DIMENSIONI-HEADER.png

Enco Engineering Consultants srl

Italian Engineers

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Menu
  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Drone Survey – Intake Area
Drone Survey – Powerhouse Area
Intake
Intake – Section
Intake
Powerhouse Plan

Rite - 2nd Head
Hydropower Plant

Project Description:

Run-of-river small hydropower plant in mountain environment.

Details of the Hydropower Plant:
Net head: 212,94 m
Maximum Flow Rate: 450 l/sec
Penstock Diameter: 600 mm
Penstock Length: 3.925,00 m
Turbine Type: Pelton, 4 injectors
Installed Capacity: 743 KW
Energy Output: 4.600.000 KWh

Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study
Assistance for procurement
Supervision of works

Client:
Fontana S.r.l.
Year:
2010 - 2011
Location:
Italy, Cibiana di Cadore (BL)

PREVIOUS PROJECT

Pettorina – Sorarù Hydropower Plant

NEXT PROJECT

Yovi Hydropower Plant

RELATED PROJECTS

Map

Mali Hydropower Market Intelligence

by webmaster
Zunaia weir

Torrent Zunaia Flood Management Works

by webmaster
Immagine42

Rockfall at National Road N°153

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2025 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket