• Via Feltre, 183 - Sedico (BL)
  • (+39) 0437 852727
Linkedin
ENCO ITALYcropped-LOGO-BANDIERA-DIMENSIONI-HEADER.png

Enco Engineering Consultants srl

Italian Engineers

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Menu
  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Powerhouse
Powerhouse Plan
Francis Turbine
Fish Ladder
Intake Layout
Penstock Layout

Pettorina - Sorarù Hydropower Plant

Project Description:

Run-of-river small hydropower plant in mountain environment

Details of the Hydropower Plant:
Net head: 79.93 m
Maximum flow rate: 1200 l/sec
Penstock diameter: 900 mm
Penstock Length: 1835 m
Turbine type: 2 Francis
Installed Capacity: 740 KW
Energy Output: 2.770.000 KWh

Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study
Assistance in tender award
Supervision of works

Client:
Consorzio F.lli Daurù
Year:
2010 - 2013
Location:
Italy, Rocca Pietore (BL)

PREVIOUS PROJECT

Frison Hydropower Plant

NEXT PROJECT

Rite 2nd Head Hydropower Plant

RELATED PROJECTS

RuArei100_1693

Ru d’Arei 2nd Head Hydropower Plant

by webmaster
02

Civita di Bagnoregio Rockfall

by webmaster
Map

Mali Hydropower Market Intelligence

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2025 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket