• Via Feltre, 183 - Sedico (BL)
  • (+39) 0437 852727
Linkedin
ENCO ITALYcropped-LOGO-BANDIERA-DIMENSIONI-HEADER.png

Enco Engineering Consultants srl

Italian Engineers

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Menu
  • About us
  • Expertise
  • Case studies
  • News
  • Contact us

Col Cavalier Tunnel

Advisor: Mr. Nicolò Doglioni, Geologist

 

Project Description:

Advising during construction works of Col Cavalier Tunnel, on the Provincial road No. 2 (Belluno – Italy). The tunnel is 1800 m long. It passes below an urbanized area, at depth of 5-34 m, throughout the Belluno Flysch formation. Such rock mass is characterized by a succession of hard sandstone (0.5-1-0 m thick layers) and weak claystone – limestone (1.0 – 3.0 m thick layers); The excavation was carried on with a jackhammer and punctual milling. The slopes at the portals have been consolidated with soil nailing.

 

Location:
Belluno, Italy

PREVIOUS PROJECT

Cala dell’acqua Rockfall

NEXT PROJECT

Tiburtina Rockfall

RELATED PROJECTS

02

Civita di Bagnoregio Rockfall

by webmaster
plan

Upgrading of the Aqueduct of Paderno del Grappa

by webmaster
Map

Mali Hydropower Market Intelligence

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2026 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket