• Via Feltre, 183 - Sedico (BL)
  • (+39) 0437 852727
Linkedin
ENCO ITALYcropped-LOGO-BANDIERA-DIMENSIONI-HEADER.png

Enco Engineering Consultants srl

Italian Engineers

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Menu
  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Intake
Intake Layout
Intake
Powerhouse
Powerhuose Section
Pelton Turbine

Ru d’arei - 2nd Head
Hydropower Plant

Project Description:

Run-of-river small hydropower plant in mountain environment.

Details of the Hydropower Plant:
Net head: 100,21 m
Maximum flow rate: 300 l/sec
Penstock Diameter: 500 mm
Length: 1.300,00 m
Turbine Type: Pelton
4 injectors vertical axis
Installed Capacity: 218 KW
Energy Output:1.000.000 KWh

Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study
CDM / HS
Assistance in tender award
Supervision of works

Client:
Hydromont S.r.l.
Year:
2007 - 2009
Location:
Italy, Rocca Pietore (BL)

PREVIOUS PROJECT

Schievenin Water Supply System

NEXT PROJECT

Rite 1st Head Hydropower Plant

RELATED PROJECTS

02

Civita di Bagnoregio Rockfall

by webmaster
FOTO DALL'ALTO

Owner’s Engineer for the Construction of River Gee Hydropower Plant

by webmaster
Immagine21

Vietri (Hotel Loyd) Rockfall

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2025 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket