• Via Feltre, 183 - Sedico (BL)
  • (+39) 0437 852727
Linkedin
ENCO ITALYcropped-LOGO-BANDIERA-DIMENSIONI-HEADER.png

Enco Engineering Consultants srl

Italian Engineers

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Menu
  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Intake
Intake
Intake Lateral View

Rite 1st Head Hydropower Plant

Project Description:

Run-of-river small hydropower plant in mountain environment

Details of the Hydropower Plant:
Net head: 174,89 m
Maximum flow rate: 300 l/sec
Penstock diameter: 500 mm
Penstock Length: 1620 m
Turbine type: Pelton
2 injectors horizontal axis
Installed Capacity: 450 KW
Energy Output: 2.400.000 KWh

Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study
CDM / HS
Assistance in tender award
Supervision of works

Client:
Fontana S.r.l.
Year:
2009 - 2010
Location:
Italy, Cibiana di Cadore (BL)

PREVIOUS PROJECT

Ru d’Arei 2nd Head Hydropower Plant

NEXT PROJECT

Sorarù Hydropower Plant

RELATED PROJECTS

E0810-IRIA MAINA_PRESA1

Iria Maina Hydropower Plant

by webmaster
Nintulo Pano-cut

Nintulo Small Hydropower Plant and Solar Based Mini Grid

by webmaster
Plan of the Plant

Aïn-Temouchent Wastewater Treatment Plant

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2025 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket