Bridge and Dam
Bridge
Francis Turbine
River
Penstocks
Powerhouse from intake

Mukungwa II Hydropower Plant Rehabilitation

Project Description:

Existing run-of-river SHPP with weir and frontal intake, steel penstocks; powerhouse with two Francis turbines; tailrace channel.

The necessary works to upgrade the SHPP from 2.5 MW to 3.6 MW include: a forebay behind the intake, a vertical gate, two trash racks, two bigger turbines.

SHPP final data after rehabilitation:
Penstocks:two 310 m steel
Penstocks’ diameters:
1650-1600-1550 mm
Gross head: 31.55 m
Turbine: 2 Francis groups
Design flow rate: 13.6 m3/s
Installed capacity: 3.6 MW
Energy output: 22.88 GWh

Activities Performed:
The contract includes also Gashashi SHPP and Mukungwa II SHPP Rehabilitation.
- Feasibility study
- Business plan
- Final design
- Tender documents.
- Works supervision as Owner’s Engineer:

Client:
Prime Energy - Rwanda
Year:
2016 - 2018
Location:
Rubavu District, Rwanda

PREVIOUS PROJECT

Gisenyi Hydropower Plant Rehabilitation

NEXT PROJECT

Lingatunda Hydropower Plant

RELATED PROJECTS

MARESI Render Centrale

Maresi Hydropower Plant

by webmaster
Nintulo Pano-cut

Nintulo Small Hydropower Plant and Solar Based Mini Grid

by webmaster
FOTO DALL'ALTO

Owner’s Engineer for the Construction of River Gee Hydropower Plant

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2025 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket