• Via Feltre, 183 - Sedico (BL)
  • (+39) 0437 852727
Linkedin
ENCO ITALYcropped-LOGO-BANDIERA-DIMENSIONI-HEADER.png

Enco Engineering Consultants srl

Italian Engineers

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Menu
  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Drone Survey – Intake Area
Drone Survey – Powerhouse Area
Intake
Intake – Section
Intake
Powerhouse Plan

Rite - 2nd Head
Hydropower Plant

Project Description:

Run-of-river small hydropower plant in mountain environment.

Details of the Hydropower Plant:
Net head: 212,94 m
Maximum Flow Rate: 450 l/sec
Penstock Diameter: 600 mm
Penstock Length: 3.925,00 m
Turbine Type: Pelton, 4 injectors
Installed Capacity: 743 KW
Energy Output: 4.600.000 KWh

Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study
Assistance for procurement
Supervision of works

Client:
Fontana S.r.l.
Year:
2010 - 2011
Location:
Italy, Cibiana di Cadore (BL)

PREVIOUS PROJECT

Pettorina – Sorarù Hydropower Plant

NEXT PROJECT

Yovi Hydropower Plant

RELATED PROJECTS

Map

Mali Hydropower Market Intelligence

by webmaster
Immagine32

Slope stabilization nearby private house in Belluno

by webmaster
YOVI_FOTO_PRESA

Yovi Hydropower Plant

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2025 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket