Area involved
Well Section

Pez Water Supply System Renovation

Project Description:

Completion of the connection of the Pez, Dorgnan and Telve villages’ water supply systems to the main water supply system of the Municipality of Cesiomaggiore.

Works included the replacement of the old damaged aqueduct pipes of the Dorgnan segment of the system. All new pipes have a polyethylene external cladding and an internal layer of epoxy resin. Implementation of ground water drainage capacity in the catch basin area.

Activities Performed:

Final Design. Supervision of works.

Client:
Municipality of Cesiomaggiore (BL), Italy
Year:
2006
Location:
Cesiomaggiore (BL), Italy

PREVIOUS PROJECT

Extension of the sewerage system of the Municipality of Cesiomaggiore

NEXT PROJECT

Schievenin Water Supply System

RELATED PROJECTS

Nintulo Pano-cut

Nintulo Small Hydropower Plant and Solar Based Mini Grid

by webmaster
Immagine13

Cala dell’acqua Rockfall

by webmaster
prova

Consultancy services for in-pipe hydro systems on water supply pipes

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2023 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket