• Via Feltre, 183 - Sedico (BL)
  • (+39) 0437 852727
Linkedin
ENCO ITALYcropped-LOGO-BANDIERA-DIMENSIONI-HEADER.png

Enco Engineering Consultants srl

Italian Engineers

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Menu
  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Preliminary Design Options
Project Layout – Preliminary Design
Powerhouse Plan – Preliminary Design
Render – Power House
Powerhouse Section – Tender Design
Weir Layout – Detailed Design

Owner’s Engineer for the Construction of River Gee Hydropower Plant

Project Description:

2.7 MW run-of-river hydropower plant on the Gee River, within River Gee County, which will connect to the currently extended 33kV cross-border transmission line

The project will provide a clean, reliable, sustainable and affordable source of energy to River Gee and Maryland counties, thereby securing power supply in the region.

The preliminary design phase envisioned different options as illustrated by the picture on the right in blue and red, to permit an optimized choice.

The best option has been chosen after an attentive analysis of cost/benefit ratio.

The objective of the assignment is to carry out detailed engineering design including site-specific investigations and surveys for the main infrastructure components of the project, prepare bidding documents for the Work contract, and assist the Client with the overall management and supervision of the procurement and implementation of the Works.

Included in the assignments are also the supervision of the implementation of the Safeguards Instruments (ESMP and RAP) for the project, and provision of assistance to the Client in the recruitment and training of the Operators of the proposed facility, the training in various engineering areas and in the management and maintenance of electrical facilities to include use of renewable energy resources.

The detailed design has been successfully finalized and the construction contract has been awarded according to ENCO’s tender documents and under ENCO assistance.

Supervision of works is now ongoing.
Client:
RREA - Rural Renewable Energy Agency
Funded by:
Abu Dhabi Fund for Development
Year:
2021 - Preliminary Design
2022 - Detailed and Tender Design
2023 - Ongoing Works Supervision
Location:
River Gee County, Liberia

PREVIOUS PROJECT

Consultancy services for in-pipe hydro systems on water supply pipes

RELATED PROJECTS

Enco-Rio Castello Hydropower Plant (2)

Rio Castello Hydropower Plant

by webmaster
E0810-IRIA MAINA_PRESA1

Iria Maina Hydropower Plant

by webmaster
Plan of the Plant

Aïn-Temouchent Wastewater Treatment Plant

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2023 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket