• Via Feltre, 183 - Sedico (BL)
  • (+39) 0437 852727
Linkedin
ENCO ITALYcropped-LOGO-BANDIERA-DIMENSIONI-HEADER.png

Enco Engineering Consultants srl

Italian Engineers

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Menu
  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Intake
Intake
Intake Lateral View

Rite 1st Head Hydropower Plant

Project Description:

Run-of-river small hydropower plant in mountain environment

Details of the Hydropower Plant:
Net head: 174,89 m
Maximum flow rate: 300 l/sec
Penstock diameter: 500 mm
Penstock Length: 1620 m
Turbine type: Pelton
2 injectors horizontal axis
Installed Capacity: 450 KW
Energy Output: 2.400.000 KWh

Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study
CDM / HS
Assistance in tender award
Supervision of works

Client:
Fontana S.r.l.
Year:
2009 - 2010
Location:
Italy, Cibiana di Cadore (BL)

PREVIOUS PROJECT

Ru d’Arei 2nd Head Hydropower Plant

NEXT PROJECT

Sorarù Hydropower Plant

RELATED PROJECTS

02

Civita di Bagnoregio Rockfall

by webmaster
Immagine13

Cala dell’acqua Rockfall

by webmaster
Nakatuta PowerHouse Layout

Nakatuta Hydropower Project

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2025 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket