• Via Feltre, 183 - Sedico (BL)
  • (+39) 0437 852727
Linkedin
ENCO ITALYcropped-LOGO-BANDIERA-DIMENSIONI-HEADER.png

Enco Engineering Consultants srl

Italian Engineers

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Menu
  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Intake
Powerhouse Plan
Intake
Intake Section
Pelton Turbine
Penstock Layout

Rio Castello Hydropower Plant

Project Description:

Run-of-river Small Hydropower Plant in mountain environment.

Details of the Hydropower Plant
Net Head: 151,28m
Maximum Flow Rate: 450 l/sec
Penstock Diameter: 500 mm
Length: 1405,00 m
Turbine type: Pelton, 4 injectors
Installed Capacity: 511 KW
Energy Output: 2.300.000 KWh

Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study

Client:
K ENERGIA S.r.l.
Year:
2009 - 2011
Location:
Livinallongo del Col di Lana (BL), Italy

PREVIOUS PROJECT

Nogarola Hydropower Plant

NEXT PROJECT

Frison Hydropower Plant

RELATED PROJECTS

cancia orto+plan

Cancia Debris Flow Hazard Management Works

by webmaster
RuArei100_1693

Ru d’Arei 2nd Head Hydropower Plant

by webmaster
Rilievo

Schievenin Water Supply System

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2025 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket