• Via Feltre, 183 - Sedico (BL)
  • (+39) 0437 852727
Linkedin
ENCO ITALYcropped-LOGO-BANDIERA-DIMENSIONI-HEADER.png

Enco Engineering Consultants srl

Italian Engineers

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Menu
  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
Intake
Powerhouse Plan
Intake
Intake Section
Pelton Turbine
Penstock Layout

Rio Castello Hydropower Plant

Project Description:

Run-of-river Small Hydropower Plant in mountain environment.

Details of the Hydropower Plant
Net Head: 151,28m
Maximum Flow Rate: 450 l/sec
Penstock Diameter: 500 mm
Length: 1405,00 m
Turbine type: Pelton, 4 injectors
Installed Capacity: 511 KW
Energy Output: 2.300.000 KWh

Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study

Client:
K ENERGIA S.r.l.
Year:
2009 - 2011
Location:
Livinallongo del Col di Lana (BL), Italy

PREVIOUS PROJECT

Nogarola Hydropower Plant

NEXT PROJECT

Frison Hydropower Plant

RELATED PROJECTS

FOTO DALL'ALTO

Owner’s Engineer for the Construction of River Gee Hydropower Plant

by webmaster
Nintulo Pano-cut

Nintulo Small Hydropower Plant and Solar Based Mini Grid

by webmaster
DCIM106GOPRO

Rite 2nd Head Hydropower Plant

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2026 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket